Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Schedule and Index schemes mutliplying like rabbits

Erika Epstein
Booster
Schedule and Index schemes are multiplying like rabbits in a project with two files hotlinked into each other.

There is a building file and a site file. The project has over 70 of each type of index and schedule.

I've never seen this before. why is this happening and is there a way to avoid this?
Erika
Architect, Consultant
MacBook Pro Retina, 15-inch Yosemite 2.8 GHz Intel Core i7 16 GB 1600 MHz DDR3
Mac OSX 10.11.1
AC5-18
Onuma System

"Implementing Successful Building Information Modeling"
1 REPLY 1
Anonymous
Not applicable
Not here?!

Still looking?

Browse more topics

Back to forum

See latest solutions

Accepted solutions

Start a new discussion!